For sale brick apartment
|
Condition of the real estate
|
newly built |
|
Year of construction
|
2026 |
|
Conveniences
|
luxury |
|
Floor
|
2 |
|
Building levels
|
8 |
|
Lift
|
yes |
|
Interior height
|
less than 3 m |
|
Air conditioner
|
yes |
|
Accessibility
|
yes |
|
Bathroom and toilet
|
together |
|
Orientation
|
southeast |
|
View
|
panoramic |
|
Balcony size
|
3 m2 |
|
Garden connection
|
no |
|
Attic
|
not attic |
|
Parking
|
not provided |
|
Condition of the real estate
|
newly built |
|
Year of construction
|
2026 |
|
Conveniences
|
luxury |
|
Floor
|
2 |
|
Building levels
|
8 |
|
Lift
|
yes |
|
Interior height
|
less than 3 m |
|
Air conditioner
|
yes |
|
Accessibility
|
yes |
|
Bathroom and toilet
|
together |
|
Orientation
|
southeast |
|
View
|
panoramic |
|
Balcony size
|
3 m2 |
|
Garden connection
|
no |
|
Attic
|
not attic |
|
Parking
|
not provided |
Sustainability
|
Average gas consumption
|
The property is not connected to the gas network |
|
Average electric consumption
|
1 kWh/month |
|
Overhead
|
not provided |
|
Common charges
|
not provided |
|
Heating
|
ceiling cooling-heating, heat-pump |
|
Insulation
|
yes - 20 cm |
|
Energy performance certificate
|
A++ |
|
Energy efficient
|
yes |
|
Average gas consumption
|
The property is not connected to the gas network |
|
Average electric consumption
|
1 kWh/month |
|
Overhead
|
not provided |
|
Common charges
|
not provided |
|
Heating
|
ceiling cooling-heating, heat-pump |
|
Insulation
|
yes - 20 cm |
|
Energy performance certificate
|
A++ |
|
Energy efficient
|
yes |
Description
Near Westend in Budapest's 13th district
A completely new, southeast-facing, sunny studio
apartment on the 2nd floor with a balcony, ready to
move in immediately, is for sale at a big discount!
Westside Grand I-II, the newest member of Biggeorge Property's Westside development series, is just a 10-minute walk from City Park, Westend Shopping Center, and Nyugati Railway Station. On the ground floor of the modern building, several new shops and services await the new residents. The project is being built with the most modern technical features! Handover is in October 2026.ktober 2026.