For sale brick apartment
|
Condition of the real estate
|
not provided |
|
Year of construction
|
2026 |
|
Conveniences
|
with all modern conveniences |
|
Floor
|
4 |
|
Building levels
|
5 |
|
Lift
|
yes |
|
Interior height
|
less than 3 m |
|
Air conditioner
|
yes |
|
Accessibility
|
no |
|
Bathroom and toilet
|
together |
|
Orientation
|
south |
|
View
|
street view |
|
Balcony size
|
7 m2 |
|
Garden connection
|
not provided |
|
Attic
|
not attic |
|
Parking
|
street, public space |
|
Condition of the real estate
|
not provided |
|
Year of construction
|
2026 |
|
Conveniences
|
with all modern conveniences |
|
Floor
|
4 |
|
Building levels
|
5 |
|
Lift
|
yes |
|
Interior height
|
less than 3 m |
|
Air conditioner
|
yes |
|
Accessibility
|
no |
|
Bathroom and toilet
|
together |
|
Orientation
|
south |
|
View
|
street view |
|
Balcony size
|
7 m2 |
|
Garden connection
|
not provided |
|
Attic
|
not attic |
|
Parking
|
street, public space |
Sustainability
|
Average gas consumption
|
not provided |
|
Average electric consumption
|
not provided |
|
Overhead
|
not provided |
|
Common charges
|
35 000 HUF/month |
|
Heating
|
heat-pump |
|
Insulation
|
yes |
|
Energy performance certificate
|
not provided |
|
Average gas consumption
|
not provided |
|
Average electric consumption
|
not provided |
|
Overhead
|
not provided |
|
Common charges
|
35 000 HUF/month |
|
Heating
|
heat-pump |
|
Insulation
|
yes |
|
Energy performance certificate
|
not provided |
Description
We are offering for sale a newly built apartment in a beautifully renovated building with a new facade and equipped with a new elevator.
The apartment is located on the 5th floor, is single-level, street-facing, and has a southern exposure, making it a bright and pleasant home. It has an area of 53 sqm, with an additional 7 sqm balcony. It consists of a living room and 1 bedroom.
Main technical specifications:
- Ceiling cooling/heating, complemented by underfloor heating
- Air exchange system
- Aluminum windows with a shutter system
- Smart home system
The project is expected to be completed in the first quarter of 2027.