For sale family house
|
Condition of the real estate
|
like new |
|
Year of construction
|
2026 |
|
Conveniences
|
with all modern conveniences |
|
Building levels
|
single-floor |
|
Air conditioner
|
yes |
|
Accessibility
|
yes |
|
Bathroom and toilet
|
separately and together |
|
View
|
not provided |
|
Attic
|
cannot be built in |
|
Cellar
|
no |
|
Parking
|
courtyard parking - included in the price |
|
Condition of the real estate
|
like new |
|
Year of construction
|
2026 |
|
Conveniences
|
with all modern conveniences |
|
Building levels
|
single-floor |
|
Air conditioner
|
yes |
|
Accessibility
|
yes |
|
Bathroom and toilet
|
separately and together |
|
View
|
not provided |
|
Attic
|
cannot be built in |
|
Cellar
|
no |
|
Parking
|
courtyard parking - included in the price |
Sustainability
|
Average gas consumption
|
not provided |
|
Average electric consumption
|
not provided |
|
Overhead
|
not provided |
|
Common charges
|
not provided |
|
Heating
|
heat-pump, underfloor heating |
|
Solar panel
|
no |
|
Insulation
|
yes - 15 cm |
|
Energy performance certificate
|
not provided |
|
Average gas consumption
|
not provided |
|
Average electric consumption
|
not provided |
|
Overhead
|
not provided |
|
Common charges
|
not provided |
|
Heating
|
heat-pump, underfloor heating |
|
Solar panel
|
no |
|
Insulation
|
yes - 15 cm |
|
Energy performance certificate
|
not provided |
Description
NOT A LAND, NOT A SEMI-DETACHED HOUSE, YOU DON'T HAVE TO PASS THROUGH YOUR NEIGHBORS!
The excellence and uniqueness of the project is that the land on which the houses are built opens onto two streets, Liszt Ferenc Street and Dankó Pista Street, so both buildings have their own street-front entrance!
Both buildings have a useful floor area of 93 m2, with a 15 m2 terrace and a 19 m2 covered car park, on a plot of approximately 400 m2.
Technical parameters:
VIABLOKK 30 wall, 15 cm graphite thermal insulation, 3-layer glazed plastic windows and doors, concrete tile roofing, heat pump heating system, split air conditioning cooling.
We will send a detailed technical description by e-mail.
Wide street with all utilities, asphalt. Nearby school, kindergarten, service units, shops. The BKK bus stop number 94 is nearby.
Expected delivery in the 4th quarter of 2026.
The contractor is CSÍZIÓ-STÚDIÓ KFT, a professional construction company based in Gyál with more than 20 years of experience and a stable financial background, with many reference works to view!
Map is temporarily unavailable.